REGIONAL ASSOCIATION VI
Task Team on Hydrology: Overview of practices in operational flood forecasting and early warning of National Hydrological Services
Only for internal use of NHMS/NHS of WMO RA VI. Do not spread the link.
NHS/NHMS - overview
QUESTIONS:
1. Organization status
2. Legal framework
3. Regional Departments
Number
Average area
4. List of activities
Quality checking of real-time data from the gauging stations
Processing of forecasts (publishing forecast results and derived products)
Calculation of hydrological forecast
Preparing and issuing of warnings.
Dissemination of warnings for all users.
Information support for media, civil protection and stakeholders.
5. Cooperation with meteorologists
6. Hydrologists in charge
7. Operation of gauging stations
8. Hydrological forecasting model
9. Forecasted elements
River stage and river discharge at forecasting points
River discharge for any spot along the river
Extent of flooded area. (Hydraulic modelling).
Ice jams.
Water level in lakes.
Water level of ground water.
Urban flooding.
10. Lead-time
Short-range forecasts
Medium-range forecasts
11. Hydrological forecast updating
12. Time step of the hydrological model
13. Spatial resolution
14. Probabilistic forecast
15. Models
Rainfall-runoff model
Snow-melting model
Channel-routing model
Reservoir model
Hydraulic model
16. Rainfall-runoff model type
17. Human interaction
Manual checking and correcting the input data.
Manual adjusting of initial conditions.
Manual adjusting of model parameters.
Manual adjusting of model outputs (for example flow hydrograph).
The model is fully automated. It doesn't require human interaction.
18. Forecast evaluation
19. Development of models
20. Challenges
21. Question for next Q.
QUESTION:
Click an item in the list to see the answers.
Note: Click on the map for detailed information on each NHS.
ANSWERS:
Disclaimer: Only for internal use of NHMS/NHS of WMO RA VI.
Web content manager: tomas.vlasak[ad]chmi.cz