in the year: 1999



Basic data
Station number: 1008
Station name: Teplice
Station type: stacionary - AMS-SRS
District: Teplice
Institution: Czech Hydrometeorological Institute
Laboratory address
ČHMÚ-pobočka Ústi n/Labem
Ing.Plachá Helena
Pošt.přihrádka 2
400 11 Ústi n/Labem
Tel: 047/2773218
Fax: 047/2778896
Impeachable worker address
ČHMÚ-pobočka Ústí n/Labem-AIM
Ing.Bitter Miroslav
Pošt. přihrádka 2
400 11 Ústí n/Labem
Tel: 047/2773218
Fax: 047/2778896
Location
Geographics coordinates:latitude: 50° 38' 25" ;   longitude: 13° 49' 39"
Altitude: 225 m
Expletory data of station
Landscape: Plain
Scenery: Poly-storeyed built-up area (housing estates of the recent decades)
Representative: District (County) scale (0.5-4 km)
Purpose: Evaluation of concentration in urban areas
Verbal description placing
V centru města na volné rovinaté část. zatravněné ploše, mimo přímé ovliv- nění dopravou, v okolí (50-120m) budovy, V-směrem park.
Registration
Date of establishment station: 01-03-1992 Date of termination station:
Pollutant
Method
Unit
Interval
Begin date
End date
SO2 (sulphur dioxide) UVFL (UV-fluorescence)ug/m^3 30 min 01-03-1992
NO (nitrogen monoxide) CHLM (chemiluminescence)ug/m^3 30 min 01-03-1992
NO2 (nitrogen dioxide) CHLM (chemiluminescence)ug/m^3 30 min 01-03-1992
CO (carbon monoxide) IRABS (IR corel. absorption spectrometry)ug/m^3 30 min 01-01-1994
O3 (ozone) UVABS (UV-absorption)ug/m^3 30 min 25-01-1993
NOx (nitrogen oxides(oxides of nitrogen)) CHLM (chemiluminescence)ug/m^3 30 min 01-03-1992
SPM (suspended particulate matter) RADIO (radiometry - beta ray absorption)ug/m^3 30 min 01-03-199231-12-1993
PM10 (PM 10 particulate matter 10) RADIO (radiometry - beta ray absorption)ug/m^3 30 min 01-01-1994
Hg (mercury) AFS (low-temperature gas atomic fluorescence spectrometry)ng/m^3 30 min 01-01-199731-12-1997
WV (wind velocity) OPEL (optoelectronic method)m/s 30 min 01-01-1994
WD (wind direction) OPEL (optoelectronic method)deg 30 min 01-01-1994
h (relative air humidity (h. of air)) CAP (capacitance sensor)% 30 min 01-01-1994
GLRD (global radiation) TDM (temperature difference method)W/m2 30 min 01-01-1994
T2m (temperature 2m above terrain) PT100 (resistance method)K 30 min 01-01-1995